Vineyard Park
CLIENT/LOCATION
City of West Kelowna – West Kelowna, BC
DATE
2016
DIVISION INVOLVED
Background
Cabin transformed an existing parkland area into a modern community park. Activities included layout & grading, turf area, planting area (mulch, shrubs), crusher chip paving, asphalt milling pathway, EWF installation for swing set, irrigation installation, tree planting & staking, stone step placement, split rail fencing, brick paving stone décor, site security and traffic control.
Challenge
Paving stone placement was a circular design on a subtle hill located immediately adjacent to a roundabout intersection.
Solution
Compacting and levelling out the granular base to 95% MPD in a circular design with a 3% grade towards the sidewalks and roundabout intersection required a precise attention to detail. Polymeric jointing sand was used to join the cracks between stones which prevents the stones from getting loose and allows precipitation to runoff.
Vernon Office
Unit 20A – 100 Kalamalka Lake Rd.
Vernon, British Columbia
Canada V1T 9G1
Nelson Office
Room #700 – 901 Front St.
Nelson, British Columbia
Canada V1L 4C1
Kelowna Office
#2-3304 Appaloosa Rd.
Kelowna, British Columbia
Canada V1V 2W5
Looking for a new career?
©2022 Cabin Resource Management. All rights reserved.