Vineyard Park
CLIENT/LOCATION
City of West Kelowna – West Kelowna, BC
DATE
2016
DIVISION INVOLVED
Background
Cabin transformed an existing parkland area into a modern community park. Activities included layout & grading, turf area, planting area (mulch, shrubs), crusher chip paving, asphalt milling pathway, EWF installation for swing set, irrigation installation, tree planting & staking, stone step placement, split rail fencing, brick paving stone décor, site security and traffic control.
Challenge
Paving stone placement was a circular design on a subtle hill located immediately adjacent to a roundabout intersection.
Solution
Compacting and levelling out the granular base to 95% MPD in a circular design with a 3% grade towards the sidewalks and roundabout intersection required a precise attention to detail. Polymeric jointing sand was used to join the cracks between stones which prevents the stones from getting loose and allows precipitation to runoff.
Vernon Office
Unit 20A - 100 Kalamalka Lake Rd.
Vernon, BC, V1T 9G1
778-475-3655
Nelson Office
Room #500A - 901 Front St.
Nelson, BC, V1L 4C1
778-463-1045
Kelowna Office
#2-3304 Appaloosa Rd.
Kelowna, BC, V1V 2W5
Nakusp Office
119 Broadway St W
Nakusp, BC V0G 1R0
250-265-3603