Vehicle Bridge Mission Creek Greenway Spawning Channel
CLIENT/LOCATION
RDCO – Kelowna, BC
DATE
2017
DIVISIONS INVOLVED
We designed and constructed an 8-meter (40-foot) vehicle bridge over the Greenway Spawning Channel in Mission Greenway Park, enhancing accessibility while preserving the natural environment. The project involved site grading, the installation of rip rap for erosion control, and the construction of concrete abutments to support the bridge. We then installed a durable steel superstructure and finished the bridge with timber decking and railings, ensuring both strength and aesthetics.
Throughout construction, we conducted environmental monitoring to protect the sensitive spawning channel and its surrounding habitat. Despite the complexity of the site and environmental considerations, the project was successfully completed on time and within budget, delivering a functional and environmentally responsible solution for the park.
General Inquiries
Vernon Office
Unit 20A - 100 Kalamalka Lake Rd.
Vernon, BC, V1T 9G1
778-475-3655
Nelson Office
Room #500A - 901 Front St.
Nelson, BC, V1L 4C1
778-463-1045
Kelowna Office
#2-3304 Appaloosa Rd.
Kelowna, BC, V1V 2W5
Nakusp Office
119 Broadway St W
Nakusp, BC V0G 1R0
250-265-3603