Background
Teamed with Stantec Engineering, Cabin designed and constructed the first phase of a comprehensive inner-city bike park. The park consisted of a climb trail, flow trail, three pump tracks, and a bike repair station. The project involved installation of park infrastructure such as irrigation, drainage, furniture and fencing. This project is a great showcase of Cabin’s capabilities when it comes to turn-key bike park construction.
Challenge
This was an ambitious project with a limited budget in an urban setting which also had a sharps safety hazard involved.
Solution
Staying in close contact with city bylaw staff to ensure that sharps sweeps were conducted on site multiple times a week to confirm sites were safe for staff. Cabin also worked with the client on a design that works with the landscape as well as provided a talented crew and appropriate equipment to build the features.
Vernon Office
Unit 20A - 100 Kalamalka Lake Rd.
Vernon, BC, V1T 9G1
778-475-3655
Nelson Office
Room #500A - 901 Front St.
Nelson, BC, V1L 4C1
778-463-1045
Kelowna Office
#2-3304 Appaloosa Rd.
Kelowna, BC, V1V 2W5
Nakusp Office
119 Broadway St W
Nakusp, BC V0G 1R0
250-265-3603