Fernie Pedestrian Bridge
CLIENT/LOCATION
City of Fernie – Fernie, BC
DATES
Fall 2022
DIVISIONS INVOLVED

The City of Fernie was extending their paved pedestrian pathways, working to connect the local ski hill to the downtown of Fernie. Cabin’s role in the project was to create a covered bridge over a small creek to match the Fairy Creek covered bridge on the other side of town.
The covered bridge had load rating requirements to handle vehicle traffic. A large steel frame was fabricated off site and needed to be lifted into place. The narrow trail corridor and proximity to power lines limited our machine options. We placed an excavator on either side of the creek channel, dividing the weight requirements, and reducing the needed length of boom. Allowing for two smaller machines to move the super structure into position while maintaining employee safety.
Working at heights over a creek created challenges for safe ladder placement and scaffold options so we altered our work process to allow access through the roof structure and utilized the fall arrest systems from above.
This bridge is a part of a bigger plan to connect the community, making it easier for pedestrians and cyclists to move between the ski hill and downtown. Plus, it looks awesome and blends perfectly with Fernie’s mountain town vibe!
Vernon Office
Unit 20A – 100 Kalamalka Lake Rd.
Vernon, British Columbia
Canada V1T 9G1
Nelson Office
Room #700 – 901 Front St.
Nelson, British Columbia
Canada V1L 4C1
Kelowna Office
#2-3304 Appaloosa Rd.
Kelowna, British Columbia
Canada V1V 2W5
Looking for a new career?
©2022 Cabin Resource Management. All rights reserved.