Background

Challenge

This project was to be completed within a 14-day fisheries timing window. During this two-week period, a large precipitation event put a halt on the majority of project work.

Solution

Restored three riprap revetments to protect abutments of pedestrian bridges in the Mission Creek Greenway Regional Park. Constructed three channel diversions using the creation of dams and redirection of main flows. Fish salvage and coordination with hydrologists, Geotech, and environmental monitors to ensure compliance with Section 11 permit and environmental management plan. Placed rip rap as per the engineered design and best practices. Carried out streamside and instream substrate post-construction restoration and rehabilitation. Constructed and rehabilitated trail. Felled danger trees, chipped and pruned for fuel mitigation and recreational use.

Adaptability and time management were crucial to the success of this project. When precipitation occurred, shifts in resources and responsibilities were conducted to make sure objectives were still completed in the allotted time frame.

Mission Creek Greenway Bridges/Abutment Protection Repairs
Mission Creek Greenway Bridges/Abutment Protection Repairs
Mission Creek Greenway Bridges/Abutment Protection Repairs
Mission Creek Greenway Bridges/Abutment Protection Repairs
CABIN logo

Vernon Office

Unit 20A – 100 Kalamalka Lake Rd.
Vernon, British Columbia
Canada V1T 9G1

Nelson Office

Room #700 – 901 Front St.
Nelson, British Columbia
Canada V1L 4C1

Kelowna Office

#2-3304 Appaloosa Rd.
Kelowna, British Columbia
Canada V1V 2W5

©2022 Cabin Resource Management. All rights reserved.